Divertor Tokamak Test facility (DTT)

Post by crowberry »

The Divertor Tokamak Test facility (DTT) is a superconducting tokamak costing 500 M€ to be built in Frascati, Italy to develop divertor technology for DEMO. The construction is set to start in November 2018 and it will take seven years to complete the device. The tokamak is 10 m high and has a 5 m radius.

https://physicsworld.com/a/italy-picks- ... -facility/
http://www.fsn-fusphy.enea.it/DTT/?jjj=1522916773320

ladajo
Posts: 6258
Joined: Thu Sep 17, 2009 11:18 pm
Location: North East Coast

Re: Divertor Tokamak Test facility (DTT)

Post by ladajo »

Oh joy, another ITER money pit.
The development of atomic power, though it could confer unimaginable blessings on mankind, is something that is dreaded by the owners of coal mines and oil wells. (Hazlitt)
What I want to do is to look up C. . . . I call him the Forgotten Man. (Sumner)

krenshala
Posts: 914
Joined: Wed Jul 16, 2008 4:20 pm
Location: Austin, TX, NorAm, Sol III

Re: Divertor Tokamak Test facility (DTT)

Post by krenshala »

So, are these 7 years to "develop the device" part of the planned time for ITER development/construction, or is this in addition to it?

crowberry
Posts: 672
Joined: Sun Sep 08, 2013 6:34 am

Re: Divertor Tokamak Test facility (DTT)

Post by crowberry »

krenshala wrote:So, are these 7 years to "develop the device" part of the planned time for ITER development/construction, or is this in addition to it?
The DTT targets DEMO, so my understanding is that the schedule of DTT construction is independent of the ITER schedule.