Helion Energy to demonstrate net electricity production by 2024

Point out news stories, on the net or in mainstream media, related to polywell fusion.

Moderators: tonybarry, MSimon

mvanwink5
Posts: 2149
Joined: Wed Jul 01, 2009 5:07 am
Location: N.C. Mountains

Re: Helion Energy to demonstrate net electricity production by 2024

Post by mvanwink5 »

Very nice.
Counting the days to commercial fusion. It is not that long now.

mvanwink5
Posts: 2149
Joined: Wed Jul 01, 2009 5:07 am
Location: N.C. Mountains

Re: Helion Energy to demonstrate net electricity production by 2024

Post by mvanwink5 »

Coils arrived! Building is ready! Wow! Go Helion.
Counting the days to commercial fusion. It is not that long now.

Skipjack
Posts: 6812
Joined: Sun Sep 28, 2008 2:29 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Skipjack »

Piiiiiicture....
HelionTweetCoils.JPG
HelionTweetCoils.JPG (57.64 KiB) Viewed 4798 times

Carl White
Posts: 482
Joined: Mon Aug 24, 2009 10:44 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Carl White »

If only the webcode here offered upvoting.

mvanwink5
Posts: 2149
Joined: Wed Jul 01, 2009 5:07 am
Location: N.C. Mountains

Re: Helion Energy to demonstrate net electricity production by 2024

Post by mvanwink5 »

Piiiiiicture....
Beautiful sight to behold...
Counting the days to commercial fusion. It is not that long now.

crowberry
Posts: 673
Joined: Sun Sep 08, 2013 6:34 am

Re: Helion Energy to demonstrate net electricity production by 2024

Post by crowberry »

It's nice to see the progress possible when funding is not the limiting factor.

That building is quite large so a lot of activities will fit in there. I wonder how much space is required for Polaris with the needed capacitor banks and other equipment?

Skipjack
Posts: 6812
Joined: Sun Sep 28, 2008 2:29 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Skipjack »

crowberry wrote:
Wed Feb 23, 2022 6:00 pm
It's nice to see the progress possible when funding is not the limiting factor.

That building is quite large so a lot of activities will fit in there. I wonder how much space is required for Polaris with the needed capacitor banks and other equipment?
This is the Antares building, the larger facility that they are building the Polaris building right next to. Antares is essentially where they build and assemble their machines (not just the Polaris machine, but future machines as well). From what I remember, Trenta was recently moved there as well.
Antares is huge compared to Polaris. Helion has recently acquired a 3rd facility in Everett as well. That one will house their toolshop, where they are making the machines to make the machines...
Picture: Antares is the building to the left, the red outline marks the rough size and location of the Polaris building:
HelionLocationMarked.jpg
HelionLocationMarked.jpg (175.04 KiB) Viewed 4678 times

Skipjack
Posts: 6812
Joined: Sun Sep 28, 2008 2:29 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Skipjack »

Small video of plasmoids merging in Trenta. Unfortunately Twitter only for now:
https://twitter.com/Helion_Energy/statu ... khp-nWy9pg

Skipjack
Posts: 6812
Joined: Sun Sep 28, 2008 2:29 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Skipjack »

David Kirtley will be presenting at the White House Fusion summit tomorrow:
KirtleyWhiteHouse.JPG
KirtleyWhiteHouse.JPG (56.27 KiB) Viewed 4096 times
Other FIA members like ZAP, CFS and TAE also have representatives there. This could be a very interesting event to watch!
https://www.whitehouse.gov/ostp/events-webinars/

Carl White
Posts: 482
Joined: Mon Aug 24, 2009 10:44 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Carl White »

The panel David Kirtley is on begins at 2:20:17 (https://youtu.be/oUknjLH4HEo?t=8417).

Pretty much the first thing that the moderator says is, "We've just heard some really amazing, concrete ways that we can pull people in and make this community bigger... get these companies to share what they're working on to promote diversity and energy justice at their organizations".

A quick skim of the preceding material suggests it's in the same vein.

I hope this kind of politics doesn't get in the way. The emphasis should be on clearing away hurdles at this point.

mvanwink5
Posts: 2149
Joined: Wed Jul 01, 2009 5:07 am
Location: N.C. Mountains

Re: Helion Energy to demonstrate net electricity production by 2024

Post by mvanwink5 »

diversity and energy justice
Word salad.
Counting the days to commercial fusion. It is not that long now.

Skipjack
Posts: 6812
Joined: Sun Sep 28, 2008 2:29 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Skipjack »

Great info at yesterday's NRC meeting. Lot's of new details about Helion's machine and power plant concept:
https://adamswebsearch2.nrc.gov/webSear ... L22081A057
Key takaways:
Machine will be 20 meters long and 3 meters in diameter (roughly what we anticipated but this is the first time we see a firm number). That means it will be road transportable like a Falcon 9 first stage.
They still aim for net electricity generation in 2024.

Munchausen
Posts: 230
Joined: Mon Sep 17, 2007 5:36 pm
Location: Nikaloukta

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Munchausen »

Very interesting!

A little reflection on the dosage estimations in the accident scenarios on page 119: They are given no time dimension. Why? Are they designating total accumulated dose relating to the released core content?

I have seen a lot of maps of charted dosage from Fukushima and they are depicting microSievert per hour.

Anyway, if dose scenarios from from even remotely plausible accident scenarios ("Entire vacuum vessel wall turned to dust") fall in this range, it must be questioned whether this technology should be regulated at all.

Nuclear safety regulations somehow fails to recognise the dangers of not producing the energy. The ultimate result of not using nuclear power is energy scarcity.

Which is way more dangerous than any nuclear power plant has ever been. It kept human population numbers low for millennias and made life a misery for the few that still managed to make a living.

Skipjack
Posts: 6812
Joined: Sun Sep 28, 2008 2:29 pm

Re: Helion Energy to demonstrate net electricity production by 2024

Post by Skipjack »

Munchausen wrote:
Tue Mar 29, 2022 7:16 pm
Very interesting!

A little reflection on the dosage estimations in the accident scenarios on page 119: They are given no time dimension. Why? Are they designating total accumulated dose relating to the released core content?

I have seen a lot of maps of charted dosage from Fukushima and they are depicting microSievert per hour.

Anyway, if dose scenarios from from even remotely plausible accident scenarios ("Entire vacuum vessel wall turned to dust") fall in this range, it must be questioned whether this technology should be regulated at all.

Nuclear safety regulations somehow fails to recognise the dangers of not producing the energy. The ultimate result of not using nuclear power is energy scarcity.

Which is way more dangerous than any nuclear power plant has ever been. It kept human population numbers low for millennias and made life a misery for the few that still managed to make a living.
I fully agree with everything you said. I think the dosage is total accumulated dose, but I can ask David for clarification on this.

mvanwink5
Posts: 2149
Joined: Wed Jul 01, 2009 5:07 am
Location: N.C. Mountains

Re: Helion Energy to demonstrate net electricity production by 2024

Post by mvanwink5 »

Skipjack wrote:
Thu Mar 24, 2022 9:06 am
Great info at yesterday's NRC meeting. Lot's of new details about Helion's machine and power plant concept:
https://adamswebsearch2.nrc.gov/webSear ... L22081A057
Key takaways:
Machine will be 20 meters long and 3 meters in diameter (roughly what we anticipated but this is the first time we see a firm number). That means it will be road transportable like a Falcon 9 first stage.
They still aim for net electricity generation in 2024.
What this means is that Helion's fusion electric generator will be manufactured, then delivered to the site rather than the other alternatives which will be built on site from parts shipped in. Massive advantage in cost, beyond the already advantage of not needing huge heat rejection systems like cooling towers seen on fission or fossil plants, with the large consumption of cooling water.
Counting the days to commercial fusion. It is not that long now.

Post Reply